Add: |
Chaoyang District Wangjing Beijing garden building 25, 6032 |
Tel: |
400-168-5636 |
Fax: |
400-168-5636 |
Email: |
upschinagroup@163.com |
SiteUrl: |
http://www.szsatkups.com |
|
|
The correct starting method of Santak UPS power supply |
Time:2018-07-05 Source: Views:11216 |
choose the UPS power type according to the load, and reserve time to select the number of batteries used. Santak UPS operation guide and matters needing attention 1. Boot: please make sure that the supply of electricity is normal before starting the battery switch is in a closed state. Press the switch key on the panel (3-5 seconds), and the UPS self check is completed. Two, turn off the machine, please confirm that the UPS load device has been broken, so as not to turn off the load to cause the power failure of the load equipment. Similarly, press the switch key on the panel (3-5 seconds), when the UPS shutdown is in bypass operation. Turn off the power input switch and battery switch in turn, and UPS is completely closed. The attached figure is the normal starting state of the UPS power supply. |
|